Implementation Checklist
Step-by-step setup requirements for going live with AICE Power.
Use this checklist to ensure a smooth rollout of AICE Power at your site(s).
Before installation [step]
- Confirm site address and electrical panel locations
- Ensure internet connectivity at sensor locations (Wi-Fi or Ethernet)
- Schedule a 2-3 hour installation window (no power cuts needed)
- Identify your energy manager or facility contact for each site
During setup [step]
- Sensors installed on main electrical feeds
- Data transmission verified (green status in the dashboard)
- Site name and address confirmed in the platform
- User accounts created for your team
After going live [step]
- Verify 24h of data collection on the consumption page
- Review disaggregation categories (HVAC, refrigeration, lighting)
- Set up your first alert rule
- Invite additional team members as needed
Multi-site rollout
If you're deploying across multiple sites, we recommend a phased approach:
- Start with 1-2 pilot sites
- Validate data quality and dashboard setup
- Roll out to remaining sites in batches
- Configure cross-site comparison views